More images will follow, but here is a little taste. The General Contractor is testing our foldable wall and bunk beds during construction.
| The Beginning |
![]() |
| Resource Furniture beds and lower cabinets are installed |
![]() |
| Red cabinet and soffit cabinets are being installed |
![]() |
| Bathroom/ medicine cabinet door |
![]() |
| Sliding panel for painting is installed |
![]() |
| All cabinets but movable kitchen island are in |
![]() |
| Folding wall in front of bunk beds in open position |












