More images will follow, but here is a little taste. The General Contractor is testing our foldable wall and bunk beds during construction.
The Beginning |
![]() |
Resource Furniture beds and lower cabinets are installed |
![]() |
Red cabinet and soffit cabinets are being installed |
![]() |
Bathroom/ medicine cabinet door |
![]() |
Sliding panel for painting is installed |
![]() |
All cabinets but movable kitchen island are in |
![]() |
Folding wall in front of bunk beds in open position |
No comments:
Post a Comment